How to Install Scraped Wood Flooring

Scraped wood flooring, also known as distressed or hand-scraped wood flooring, is a popular choice for those seeking a rustic and vintage look in their homes. This type of flooring is characterized by its unique texture and worn appearance, bringing a touch of natural charm to any space. In this guide, we will provide you with a step-by-step tutorial on how to install scraped wood flooring in your home.

Step 1: Prepare the Subfloor

Before you start installing scraped wood flooring, it is essential to prepare the subfloor properly. Begin by removing any existing flooring, such as carpet or vinyl, and ensure that the subfloor is clean, dry, and level. Use a moisture meter to check the subfloor’s moisture level; it should be within the manufacturer’s recommended range. Repair any cracks or uneven areas before moving forward.

Step 2: Acclimate the Flooring

Scraped wood flooring needs to acclimate to the environment in which it will be installed. Place the unopened boxes of flooring in the room where it will be installed and let them sit for at least 48-72 hours. This allows the wood to adjust to the temperature and humidity of the space. Maintain a consistent temperature and humidity level during this period, following the manufacturer’s guidelines.

Step 3: Install the Underlayment

Once the flooring has acclimated, it’s time to install the underlayment. The underlayment acts as a moisture barrier and helps to reduce noise. Roll out the underlayment across the entire floor, ensuring that it overlaps the edges by a few inches. Trim any excess underlayment using a utility knife and secure it in place using double-sided tape or staples, as per the manufacturer’s instructions.

Step 4: Measure and Cut the Flooring

Before you start laying the scraped wood flooring, measure the room’s width and divide it by the width of the individual planks. This will help you determine the number of rows needed and the width of the final row, which may need to be trimmed for a proper fit. Using a miter or circular saw, cut the boards accordingly, ensuring a precise and accurate fit.

Step 5: Lay the First Row

Begin laying the first row of scraped wood flooring along the longest wall in the room. Leave a 1/4 inch expansion gap between the flooring and the wall, which allows room for natural expansion. Secure the planks to the subfloor using a pneumatic flooring nailer or a hammer and finish nails, placing nails approximately every 6-8 inches along the board’s length.

Step 6: Install Remaining Rows

Continue installing the remaining rows of scraped wood flooring, ensuring that each plank is tightly connected to the previous one. Use a tapping block and mallet to gently tap the boards into place, ensuring a snug fit. Stagger the end joints of adjacent rows by at least 6 inches to create a visually appealing and sturdy installation. Remember to maintain the 1/4 inch expansion gap along all walls.

Step 7: Complete the Installation

Once all the rows are installed, you may need to trim the width of the final row to fit accordingly. Use a pry bar and pull bar to ensure a tight fit for this last row. To finish the installation, remove any gaps or spaces between the planks and apply a floor transition or molding around the room’s perimeter.

Congratulations! You have successfully installed scraped wood flooring in your space. Remember to follow any specific maintenance guidelines provided by the manufacturer to keep your new flooring looking its best for years to come.